Thailand Construction: Bangkok Builder’s New House Build is 3 weeks ahead of Schedule

The construction of the house for our client at Prachinburi, continues to go very well. Currently 3 weeks ahead of schedule. Ground slab works are completed and moving ahead with preparation on the 1st floor column work. All steel rebar is on site.

As a professional construction contractor in Thailand, we check all steel and concrete to make sure it is to the best specification possible and according to all technical detail in the architect’s construction drawings. All stages of construction are checked by our construction consultant, supervised by our project manager and foreman. Our goal is to always carry out the construction to the very best possible levels of quality and standards we can. Clients are welcome to check the building progress and contact us any time. If you are looking for the professional construction contractor please do not hesitate to contact us. We love building and construction. So it is a pleasure to act as your chosen house builder. We also are finishing the construction of a large factory too. So we able to provide residential construction, as well as commercial construction.

House Construction in Thailand – Bangkok Builder

Bangkok Construction Contractor: Bangkok Builder Can Help
Building a house in Thailand can be an enjoyable proposition and you can result in you having a wonderful home. But careful consideration must be given to how long it takes, the correct steps and working with a professional construction contractor.

The two main parts are the architectural design stage and then the construction stage. Bangkok builders can provide both or part of this. If you have architectural drawings completed by a licenced Thai architect and Thai engineer, we can provide you a quotation to build your house. If you do not have architectural drawings, we can also offer this service too. We have our own English speaking Thai architects who have assisted many people like you, design their home.
To design and build a house in Thailand, you are looking realistically at a minimum of 12-18 months, maybe more. This is determined by various factors, including the size and complexity of the house and how quickly the design comes together. An average size house in Thailand will take up to 12 months to build. Smaller houses maybe are able to be constructed in 10 months. All of this can be discussed and confirmed when you contact us at www.bangkokbuilder.com

Bangkok Builders Construction of a Luxury Home at Lakewood Golf Club, Bangkok

Bangkok Builder was pleased to have completed the construction of a luxury, Thai house, for a client at Lakewood Golf Club, Bangkok. We worked closely with our architect and the client to design the property. Once it was all completed, as the chosen house builder, we then started the construction of the house. The home used some natural stone, sand stone and German standard wooden flooring. It had a main swimming pool and child’s pool, separated by a bridge, which went over to the Sala. There was also an individual heated Jacuzzi.  Our smart home systems expert installed automated lighting systems, automatic remote control gates and various smart home systems for the client.

The house was built with 6 bedrooms, 7 bathrooms, living room/dining room, modern luxury kitchen, office/library, storage room, laundry room, maids accommodation, Thai kitchen and carport for 3 cars.  The master bedroom suite had a glass shower cubicle, with three types of showers, with a wall in a natural stone finish. There was also an external outside rain shower. Our carpenters installed and built walk in wardrobes and dressing room.

Another main feature in the master bedroom, was a custom made, in ground heated spa bath, with exact temperature control and automated refill. It was in fact the first time a spa bath of this size, which filled in an incredibly fast amount of time, had ever been done in Thailand.  It was custom made for the client and the actual system too was specially created for the project. Special thanks to Pooltech who assisted with all technical details. Over head fans and air conditioning was used to keep the home cool, with plenty of good insulation in the roof.

The construction of this house in Bangkok, is an example of what we can do at Bangkok Builders, as a professional construction contractor. We love to build houses for clients, we love to design them and it is our primary goal to always finish with a happy customer. Building a house in Thailand, can be difficult if you do not know a professional construction contractor, so Bangkok Builder is here to assist you every step of the way. We have our own English speaking, experienced Thai architect, if you require architectural drawings and also offer the house building service too. If you already have architectural construction drawings, then we can provide a quotation for the construction of the house only. If you are looking to build a house in Bangkok, please do contact us.  We look forward to hearing from you.

 

Factory Construction in Rayong, Thailand

Our construction team build houses in Thailand, but we also do commercial construction projects too. Here are the latest photographs of the construction of an 8,000 sq.m factory, with office, retaining wall, fence, roads, parking and warehousing for Parawood (Rubber tree wood), in Rayong, Thailand. Total project size 20,000 sq.m. The construction of the factory is on time and will be completed in 3 months. Bangkok Builder can carry out factory construction and the construction of condominiums too. If you have to build a factory, or require a construction contractor to assist with the construction of a building, please do not hesitate to contact us.

House Build Survey Completed For New Customers House Build, by Bangkok Builder

Boundary checks completed. Workers camp completed with private washing and toilet facilities. Land site survey and the arrival of the piles. The construction work begins ! As a house builder and construction contractor, we are always excited by a new construction project. It is really gratifying to build a house for a client. When the piling starts it is all steam ahead. The depth of how far a pile goes down into the ground, is calculated by the engineer, based on the engineering drawings/calculations and also the information he receives from the soil survey report. A soil survey is an important survey to have done, on any construction project. The soil survey team will go to the land and bore down, taking samples at various depths. The samples they collect and are sent to the laboratory for testing and checks. From this information a professional written, soil survey report is provided which gives vital information to the structural engineer to know how far the piles need to go down into the earth, to support the house structure. This is vital so your home is not only safe, but will not suffer from subsidence or any form of structural issues. Bangkok Builder has helped many people wishing to build a house with soil test surveys. If you would like us to assist you with this, please ask us. It should be done, preferably early on in the architectural phase, so the engineer has the information to finalise his structural drawings. Please contact Bangkok Builder for a soil test survey.

This home our client also asked our English speaking Thai architect to do all the architectural drawings. Once completed after some months working closely with the client, they then applied for permissions to build and we provided the price to build. An agreed start date given and then contracts were signed.

Thailand Construction Costs: How much does it cost to build a house ?

We often get asked how much does it cost to build a house in Thailand, or what are the construction costs in Thailand ? So we will try to offer some insight into what to expect and how to do it correctly.

A professional construction person if genuine, would not give you simply a figure without informing you, that construction costs vary according to the individual project, who is building it, the location and what they provide within their quotation. It is impossible to know accurate construction costs until you have finished architectural drawings, have knowledge of the specifications, size, site conditions, location and what materials are being used. Each house is different, as the architects drawings are different, the materials are different, location and site conditions could be different. Costs are calculated once all architects drawings are completed. A cost quotation can take 2-4 weeks depending on the size of house.

To know costs, the builder has to know from the architects drawings facts such as: what type of materials, product and manufacturer of each material and every aspect of the construction. This includes, windows, roof tiles, doors, electrical systems, sockets, light switches, insulation, wall material, pumps, bathroom finishes, tiles, floor coverings, light fittings, wood, steel, concrete, cement and all the other materials used within the construction. What size, what quantity, what product etc ? They need to know the details and information, then calculate quantities and amounts required to complete the construction. It is the only accurate way to know the construction cost. So to answer how much a house costs to build in Thailand, is a very difficult question to answer, as you can see, it varies according to each project.

What Bangkok Builder does, if our architect is designing the home, is to provide an approximate projected, construction cost, when our architect provides the architectural job description and fee proposal for architecture. It cannot be 100% accurate, as it will change during the design development stage and also we have no knowledge of the materials or specifications yet. But we try to give you an approximate projected guide. It is no guarantee of cost at all and is helpful information based on the architects experience in construction costs. But it gives you some idea for a starting point.

To do construction correctly and follow the correct process, you must work with the architect and have your architectural drawings completed first, before knowing accurate costs to build the house. You can discuss budgets with them and they can try their best to design a home within your budgets. But do remember that any changes or requests you make, during the architectural stage, alter that projected cost. So it is always a good idea if you are on a restrictive budget, to let the architect know in advance.

Approximate Information of House Construction Costs in Thailand: Remember construction costs can increase over time and because of market forces. But as of this date in 2018, we have seen the construction cost for houses in Bangkok to be any where from 25,000 baht per sq.m to 40,000 baht per sq.m, depending on everything we have mentioned in this article. It can be more if the house is high spec and a high end luxury house. But for a good, standard home in Bangkok and Thailand’s mainland provinces, maybe 25,000 to 35,000 baht per sq.m. Can it be less, yes of course. We have seen costs be as low as 20,000 Baht per sq.m for low end, small homes with lower specifications and material standards. Then again we have seen them be a lot higher if you are building on the islands of Koh Samui, or Phuket. As all materials have to be transported to the location. It is not usual to see construction costs of a luxury home on Koh Samui being 50,000 Baht per sq.m or more, for a full fit out. But as we say, it is important to understand that no one can know without a professional cost being done once all architectural drawings are completed.

This is not a cost quotation from us, as we do not have the required information yet, but it is merely a guide to be helpful to give you an approximate idea. But the only true way to know, is have your architectural drawings completed, all specifications and materials known. Then a professional cost quotation done by the construction contractor. It is too misleading to try and guess it without all of that accurate information.

If you would like Bangkok Builder to help you with construction costs, then please contact us. We do our best to help you restrict the costs as much as we can. But remember the only true way to know the cost of your house to build, is to have finished architects drawings. So it is best to start there and talk with our architect so we know what your expectations are and your approximate budget. Our advice is always follow the correct procedure, talk to our architect, talk to us and we can help you understand it more clearly. Do it correctly and you can have your house built to what you can afford, to a good standard. We are always happy to help and offer our best suggestions.

The Importance of a Soil Test Survey in Thailand when Building a House

Building a house in Thailand: Soil Tests

It is Bangkok Builder’s experience that we recommend anyone building a house in Thailand, have a professional soil test survey carried out. This should be done before your architect and engineer start structural drawings, in the architectural stage. The information gathered from the soil test report, is vital for the engineer to know how deep piles should be bored down into the ground, to support the weight of the structure.

Not everyone is experienced in construction and a lot of people, when building a house in Thailand, have not been involved in construction before. So they are not 100% clear on the process, or the importance of the various stages. Unfortunately due to this, sometimes they can listen to the wrong person, or receive the wrong advice; which can in certain circumstances, cause them considerable problems later on and very costly repairs. To avoid this, Bangkok Builder gladly provides advice and hope it helps you understand more clearly.

The building foundations naturally require being on strong and stable soils. The soil consistency and strength varies according to the specific location of the land and the land site itself. If the soil information under a building is not clearly known, the foundation of the building could have future problems, crack, subside, or in the worse case, be dangerously unstable. This can dramatically effect your home. The engineer needs to know about the soil, to do his calculations and drawings correctly. The engineer requires the soil tests report to be able to do this.

It is very important to understand, that a house weighs a considerable amount. So the engineer needs to know what the soil consistency is below the ground, so he knows how deep piles need to go, to support the weight of the home. Subsidence does occur in construction and foundation problems do occur. If this happens it can be extremely costly to repair, or correct. In some instances it cannot be corrected.  Not having a soil test survey carried out is a matter of luck, if the engineer got it right. To take that risk, is simply not worth it, when spending a lot of money on your home, the structural integrity of the building and when considering the safety of the occupants. As a construction contractor we can not emphasise this enough and advise you have a soil test done and insist to your architect and engineer it is done.

For a relatively small amount of money compared to the huge costs you could incur, if the structure has problems, we highly recommend to all our clients and anyone building a house,  to have a soil test survey carried out. Do not be a victim of bad advice, or cost cutting. It is simply not a good idea in construction.

If you have a professional soil report already, please do provide it to us, if we are doing your architectural drawings. If you do not have one yet, we can organise this to be done. It takes 1 to a few days on site for the test samples to be taken and then 2-3 weeks for the report to come back from the laboratory. Please contact Bangkok Builder if you require a soil test survey.

12 Reasons Why to Choose Bangkok Builder to Build Your House in Thailand

Bangkok Builder is proud of the property we build and houses we construct. We want our customers to be happy. As a construction contractor it is our job to know the construction industry well and know how best to do it. Here are just some of the reasons why choosing Bangkok Builder is a good idea. 

  1. We are a proven track record, are a registered Thai company and have been in business for over 12 years. We know the industry very well indeed.
  2. We have successfully built and completed houses of varying style and size for clients.
  3. We provide a standard insurance policy, during the construction period, on all houses we build.
  4. We provide a comprehensive construction contract.
  5. We have a construction consultant on every project to do weekly inspections and offer advice if required.
  6. We have Thai and English speaking staff.
  7. We often have offers*. For example, if we do the architectural construction drawings and then go on to build your house, then we in accordance with that specific offer, if current and valid, we refund the full fees paid for the architectural construction drawings and deduct them from the contracted price to build your house.
  8. We do concrete and steel checks to make sure they are correct and to acceptable industry standards.
  9. We provide a schedule of works showing the construction stages and indicate before signing contracts, when payments are due.
  10. Your payments are spread over the course of the build in various stages.
  11. We are always available to talk to you on the telephone and by email.
  12. We genuinely care about our customers and the houses we build.

*Please Note on Point 7 Design and Build: Offers are subject to the specific offer, location and its specific parameters and clauses at that time. Please confirm with us what offers are available and if they are available to your specific project and location before the time of contractual agreement.

 

Bangkok Builder is a Construction Contractor in Thailand

Bangkok Builder – Construction Contractor

We are a construction contractor in Bangkok, offering house construction, factory construction and condominium construction in various locations in Thailand. We are based in Bangkok and cover many of the neighboring provinces.

We are able to carry out construction in Bangkok, Nonthaburi, Pathum Thani, Samut Prakan, Nakhon Nayok, Chachoengsao, Chonburi, Rayong, Nakhon Pathom, Samut Songkhram, Samut Sakhon, Cha-Am, Petchaburi, Hua Hin, Prachuap Khiri Khan and Prachin Buri.

If you have completed architectural drawings and signed off by the licenced Thai architect and licenced Thai engineer, we are happy to hear from you. We can look over all your drawings.  If is within the areas we can build and within our scope of works, then we will provide you a price to do the construction works. Construction quotations normally take 2-4 weeks to complete.

Once you have the price to build, you have confirmed you wish to go ahead, we can then provide a standard construction contract for you and us to sign. It includes a guarantee and all our projects are covered by our standard insurance policy.

House Construction in Thailand

As a construction contractor in Thailand, we have our foreman and project manager on site to supervise all the works. We have Thai and English speaking staff. A standard size home can take anywhere from 8-12 months to build. Larger, more luxurious houses can take 12-18 months depending on when the project starts, complexity and size. However all of this is discussed and agreed before starting the construction project. Payments are in stages during the course of construction and written into the construction contract.

Our English Speaking Thai architects

If you do not have architectural drawings and require a Thai architect, then we can assist you. We have our own Thai, English speaking architect with many years of experience. Architectural drawings have to be done professionally by the licenced Thai architect and licenced Thai engineer, to then enable you to apply for permission to build. Once they are completed, we can then if you like us to, also provide a construction quotation to build your house. It is a good idea to start architectural drawings within plenty of time, as they can take 3-4 months, after you have confirmed all the preliminary design, master plans, floor plans, elevations and perspectives. At the end you will have full sets of professional drawings, that cover all architectural, engineering, structural, mechanical, electrical and sanitary/plumbing drawings. Everything that you require to then apply for permissions at the local government offices. Please contact us if you require architectural drawings.